What’s included
- 39.72 km main loop and 11.96 km of ramps
- Four-lane deck and approaches serving 11 towns
- Full route drawing and in-game Balota views
Private DayZ ModsDiscord
View larger ↗DayZ / ROADS / CHERNARUS
A 39.72 km four-lane loop with 11.96 km of access ramps serving 11 towns across Chernarus.
Ask about setup
Ask about progress and availability for your server.
Discuss this project ↗Ask directly on DiscordPrefer email? Message us about this creation.
A CLOSER LOOK
The 18-metre-wide main deck connects the town approaches into a continuous loop. Balota was the first driving trial. The route map shows the full network, while the gameplay views show what the Balota junction and ramps look like on the ground.
The Balota trial was approved. The full route has passed local checks and still awaits a complete driving review.
Road geometry, junction layouts and Chernarus integration by Merric Nation.